Implementation

Start in the right place, see results in 90 days, expand on proven value

Every stage delivers measurable results. Your team learns from each stage, improves the way it works, then decides the next step, so the roadmap always fits your real needs.

Implementation team talking with factory staff at the product inspection area

Roadmap

StageDurationWhat your factory gets
Assessment1 dayYour three biggest bottlenecks, and where to start.
Data standardization2–6 weeksOne agreed set of item codes, process steps, production standards and downtime reasons across departments. Valuable even before the software goes live.
Pilot90 daysManagement can answer three questions about the pilot scope; your team gets used to the new way of working.
ExpansionAs plannedRoll out what has worked to other lines and modules.

After every stage, your team and ControlMES review the results together and adjust the scope of the next stage to fit your needs. Data standardization and the pilot can run in parallel.

The most important condition

The top executive leads in person

ControlMES changes many habits in a factory. When the numbers become transparent down to every machine, shift and department, there will be pushback at times. Projects succeed when the business owner or CEO personally owns the project and sees it through, rather than handing full responsibility down the line.

Data foundation

The numbers in ControlMES are only right when the underlying data is right. Most factories already have this data, but it is scattered across Excel files, accounting software and individual people's experience. Only the data for modules in the rollout scope needs to be standardized.

Data to standardize

DataIncludesUsed inUsually comes from
Item codes and material usage standardsFinished goods, WIP, raw materials; material usage and loss allowancesPlanning, WarehouseERP, accounting software, planning files
Process steps, machines and shiftsStep sequence for each item, machines that can run it, speeds, setup times; shifts and work calendarPlanning, Production trackingProduction routings, supervisors, actual run data
Downtime reasons and machine connectivityDowntime reason list; run, stop and output signals for each machineProduction tracking, Machine connectivityTeam leaders, maintenance, on-site machine survey
WarehouseWarehouses, locations, units of measure, packing and pallet specs, opening stockWarehouse, TraceabilityStorekeepers, stock count
QualityDefect codes; criteria and frequency for incoming, in-process and final inspectionQuality management, TraceabilityQC, customer requirements
Equipment and maintenanceEquipment list, maintenance tasks and intervalsMaintenanceMaintenance team, machine records
Customers and deliveryCustomers, delivery requirements, packing specs per customerPlanning, Warehouse, deliverySales
Organization and accessDepartments, roles, usersWhole systemHR, management

How it works (2–6 weeks)

1

Collect existing data

Excel files, ERP exports, current planning files.

2

AI-assisted cleanup

Find duplicate codes, missing information and figures that don't match across files.

3

The factory signs off

Departments agree on one data set; each list has an owner.

4

Keep it current

New item codes get their process steps and standards in ControlMES before they go into production.

Ready when

  • Data for the modules in scope is complete and confirmed by the departments involved.
  • Downtime reasons and defect codes are agreed by team leaders, supervisors and QC.
  • Every list has a named person responsible for keeping it up to date.

Done by: the factory's departments involved (planning, engineering, warehouse, QC, maintenance, sales, supervisors). The ControlMES team cleans, cross-checks and guides.

Implementation principles

Start where results come fastest

A bottleneck line, one process step, or one module across the whole factory, depending on your problem.

Results after 90 days

Measurable, and management can verify them.

Management leads, operations deliver

Management sets the goals and makes the call when things get stuck; operations run the rollout day to day; IT provides technical support.

No extra work for operators

Data comes from machines and existing tasks.

Roles in the project

RoleUsuallyResponsible forTime
Project ownerBusiness owner or CEOProject results, budget, cross-department decisions, resolving friction as ways of working changeFollows progress directly, regular review meetings
Project managerPlant manager or production directorScope, rollout sequence, assigning peopleAbout 20% of their time in the first 6 months
Implementation teamThe factory's point of contact (IT or planning) with the ControlMES teamInfrastructure, network, connectivity, securityPer project plan
Key usersSupervisors of each process stepCode lists, data verification, screen feedbackAbout 30% of their time in the first 3 months
SalesSales staff and sales managerCustomer list, delivery requirements, how delivery dates are set; feedback on order and delivery screensPer project plan

Decisions for management

Own the project directly

The top executive is accountable for the results and does not hand that down the line.

Pilot scope

Choose where to start.

Supervisor time

Free up supervisors to take part.

Pilot budget

Approve the first-stage cost.

Data access

Allow sales to see production data.

One official source of numbers

ControlMES numbers are the ones used in meetings and reports, replacing notebooks and personal spreadsheets.

The 90-day test

Management can answer three questions about the pilot scope on their own, directly in ControlMES.

Real run time

How many hours did the pilot machines and lines actually produce yesterday?

Downtime reasons

Why did they stop, ranked from biggest to smallest?

Running orders

Which orders are running, and will they make their due dates?

1-day assessment

Free of charge. In the morning we follow one order through the shop floor; in the afternoon we work with each department. You receive the report within 5 days.

FAQ

We already have an ERP.

ControlMES runs alongside it and adds the shop-floor data.

Our operators aren't used to software.

Most data comes from machines and existing tasks; picking on screen takes only a few taps.

Our factory has special requirements.

ControlMES runs in four different industries and is configured for each factory.

What does it cost?

We quote after the assessment, stage by stage.

How soon will we see results?

90 days on the pilot scope.

Our staff worry about being monitored.

Common in the early stage. The top executive leads in person, uses the data to improve processes rather than to assign blame, and makes ControlMES the official source of numbers in meetings.

We tried before and it didn't work.

The assessment will show why, and how to start again.